Slings Transportation System
Study, fabrication and installation of a Slings Transportation System from the plant area to the port, via an existing underground tunnel
Location: | Greece, Volos plant |
Client: | AGET Heraklis (Lafarge Group) |
Year: | 2012 |
Description: | Complete Study, Detailed design and Engineering of Mechanical, Electrical and Automation Processes Fabrication of lifting equipment & hydraulics, rails, transportation cart, steel constructions, drive systems, etc. Development, Implementation and Installation of Automation Software Infrastructure Civil works (tunnel, access points, modifications and adaptations) Installation of all system components Commissioning works, Performance tests & Personnel training |
Customer Contact: | Kotzakolios Athanasios, New Projects Manager, Tel: +30 24210 98456 |