Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line

Turn-Key Construction of a 6,8MW Wind Farm (8 Wind Turbines GAMESA G52/850KW) including the aerial MV line (≈15km) for the interconnection of the WF to the 150/20kV PPC Substation

Location: Pylos
Client:
Year: 2013
Description:
  • Construction of platforms and roads
  • Improvement of existing access roads
  • Construction of eight WTs foundations
  • Construction of 15km aerial MV line
  • Supply and installation of all electrical equipment (transformers, MV panels, MV cables)
  • Supply and installation of MV Control Building
  • Commissioning and start-up