Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line
Turn-Key Construction of a 6,8MW Wind Farm (8 Wind Turbines GAMESA G52/850KW) including the aerial MV line (≈15km) for the interconnection of the WF to the 150/20kV PPC Substation
Location: | Pylos |
Client: | |
Year: | 2013 |
Description: |
|
Customer Contact: | Spiliotopoulos Vasileios General Manager |