Projects presentation
Projects
25.5MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation & Transmission Line / EPC Project
Turn-Key EPC Project of a New Step-Up 20/150kV 50MVA Substation (Extension)
Photovoltaic Parks Maintenance (30MW in total)
MV & LV Plant Installations
6.8MW Wind Farm, MV & LV Installation Maintenance
25.5MW Wind Farm & Substation Maintenance
HV, MV & LV Installations at Titan Cement
HV, MV & LV Installations at Hellenic Shipyards
MV & LV Technical Base Installations
Study, Fabrication and Installation of a Transportation System for big-bags containing pet-coke
Biological Treatment Plant – Process & Operational Restoration
Interconnection of the Cyclades Islands with the Mainland Grid
Construction of Wastewater Treatment Plants
Slings Transportation System
Cement Plant Excavator System Upgrade
New Masonry Cement Line Project No 9903
New Patenting Plant – EPC Project
Design, Procurement and Erection of Heavy Fuel Oil Installation Line C
Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line
42MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project
42MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project
Upgrade of Substations
10 MW Power Plant
Electrical Substation at the Olympic Village
Electrical Substation extension at Atherinolakos Crete
Erection & Commissioning of 150KV Outdoor Electrical Substation
Erection & Commissioning of 150KV Outdoor Electrical Substation
Erection Works for Kiln 1 upgrade
Horizontal Welding Machine