Projects / Energy
- 25.5MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation & Transmission Line / EPC Project Turn-Key EPC Project of a New Step-Up 20/150kV 50MVA Substation (Extension) Interconnection of the Cyclades Islands with the Mainland Grid Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line 42MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project Upgrade of Substations 10 MW Power Plant Electrical Substation at the Olympic Village Electrical Substation extension at Atherinolakos Crete Erection & Commissioning of 150KV Outdoor Electrical Substation Erection & Commissioning of 150KV Outdoor Electrical Substation