25.5MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation & Transmission Line / EPC Project
Design and Construction of a new Step up Substation 20/150kV, 50MVA and a 13,5km 150kV Transmission Line for the interconnection of a 25,5MW Wind Farm to the national grid
Location: | Mt. Kithaironas, Voiotia, Greece |
Client: | Gamesa S.A. |
Year: | 2011-2012 |
Description: | Construction of 20/150kV Substation and HV Transmission Line (TL), including:
|