Projects
- Mega Yacht FAM Cold Ironing (HEDNO / ΔΕΔΔΗΕ) TARIQ (ONEX Elefsis Shipyards) Shore-to-Ship Power Supply at ONEX Elefsis Shipyards Fuse Cutout (HEDNO / ΔΕΔΔΗΕ) Electric Energy Distribution Upgrade at ONEX Elefsis Shipyards Hellenic Energy Distribution Network Operator (HEDNO/ΔΕΔΔΗΕ) DESFA – Underwater NATURAL Gas pipeline rectification GASTRADE – Underwater installations of FSRU Alexandroupolis Underwater pipeline installation and electromecanical installations for Phytoplankton Biorefinery plant Mooring Buoy Ναύδετο Αγκυροβολίου 25.5MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation & Transmission Line / EPC Project 25.5MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation & Transmission Line / EPC Project Turn-Key EPC Project of a New Step-Up 20/150kV 50MVA Substation (Extension) Turn-Key EPC Project of a New Step-Up 20/150kV 50MVA Substation (Extension) Photovoltaic Parks Maintenance (30MW in total) Photovoltaic Parks Maintenance (30MW in total) MV & LV Plant Installations MV & LV Plant Installations
- 6.8MW Wind Farm, MV & LV Installation Maintenance 6.8MW Wind Farm, MV & LV Installation Maintenance 25.5MW Wind Farm & Substation Maintenance 25.5MW Wind Farm & Substation Maintenance HV, MV & LV Installations at Titan Cement HV, MV & LV Installations at Titan Cement HV, MV & LV Installations at Hellenic Shipyards HV, MV & LV Installations at Hellenic Shipyards MV & LV Technical Base Installations MV & LV Technical Base Installations Engineering, Study, Prefabrication & Installation of Infrastructure for “Regenerative Thermal Oxidizer” Engineering, Study, Prefabrication & Installation of Infrastructure for “Regenerative Thermal Oxidizer” Design, Construction and Installation of an Industrial Ventilation and Air Condition System Design, Construction and Installation of an Industrial Ventilation and Air Condition System Study, Fabrication and Installation of a Transportation System for big-bags containing pet-coke Study, Fabrication and Installation of a Transportation System for big-bags containing pet-coke Biological Treatment Plant – Process & Operational Restoration Biological Treatment Plant – Process & Operational Restoration Sea Water Treatment Plant Optimisation Sea Water Treatment Plant Optimisation
- Solution Preparation Tanks – Gas Fumes Extraction System Solution Preparation Tanks – Gas Fumes Extraction System Interconnection of the Cyclades Islands with the Mainland Grid Interconnection of the Cyclades Islands with the Mainland Grid Maintenance works for On Load Tap Changers Maintenance works for On Load Tap Changers Construction of Wastewater Treatment Plants Construction of Wastewater Treatment Plants Slings Transportation System Slings Transportation System Cement Plant Excavator System Upgrade Cement Plant Excavator System Upgrade New Masonry Cement Line Project No 9903 New Masonry Cement Line Project No 9903 Electrical and Mechanical Installations Electrical and Mechanical Installations New Cement Kiln Drive New Cement Kiln Drive New MCC Substation New MCC Substation
- New Hybrid Filter Installation New Hybrid Filter Installation Heavy Machine Shop Heavy Machine Shop New Patenting Plant – EPC Project New Patenting Plant – EPC Project Design, Procurement and Erection of Heavy Fuel Oil Installation Line C Design, Procurement and Erection of Heavy Fuel Oil Installation Line C Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line Turn-Key Construction of a 6.8MW Wind Farm and an Aerial 15km MV Line 38MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project 42MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project 42MW Wind Farm – New Step Up 20/150 kV 50 MVA Substation / EPC Project Upgrade of Substations Upgrade of Substations 10 MW Power Plant 10 MW Power Plant Electrical Substation at the Olympic Village Electrical Substation at the Olympic Village Electrical Substation extension at Atherinolakos Crete
- Electrical Substation extension at Atherinolakos Crete Erection & Commissioning of 150KV Outdoor Electrical Substation Erection & Commissioning of 150KV Outdoor Electrical Substation Erection & Commissioning of 150KV Outdoor Electrical Substation Erection & Commissioning of 150KV Outdoor Electrical Substation Erection Works for Kiln 1 upgrade Erection Works for Kiln 1 upgrade Horizontal Welding Machine Horizontal Welding Machine Ventilation and Cooling System Ventilation and Cooling System Installation of electrical panels Installation of electrical panels Production Line Ventilation System Production Line Ventilation System EXPLOSION PROOF Dedusting System EXPLOSION PROOF Dedusting System Plant Design and Construction Plant Design and Construction Maintenance of EL VENIZELOS AIRPORT Technical Base
- Maintenance of EL VENIZELOS AIRPORT Technical Base MV and LV energy distribution system MV and LV energy distribution system M.V. Electrical Works and Maintenance Services M.V. Electrical Works and Maintenance Services Electromechanical Systems Electromechanical Systems MV transformers maintenance MV transformers maintenance Maintenance and Repair Works on Dry Docks Maintenance and Repair Works on Dry Docks Medium and Low Voltage Installations Medium and Low Voltage Installations Complete Retrofit of Low Voltage Substation Complete Retrofit of Low Voltage Substation Electromechanical Works and Facilities Systems Maintenance Electromechanical Works and Facilities Systems Maintenance Explosive & Toxic Gas Detection System Explosive & Toxic Gas Detection System Gas Detection Units (combustible & toxic)
- Gas Detection Units (combustible & toxic) Gas Detection Units Gas Detection Units Design and Supply of Explosive Gas Detection System Design and Supply of Explosive Gas Detection System